I hope my project Viktor Fitness will get a real life and it will be used by people. It will be developed by people for people. And I am still looking for a job in different IT directions. So I am covering the DevOps direction. I am preparing the project for team development. Continuos integration is a part of project development team. Different development tools enhance reliability, quality of projects and speed of big teams. It is a cool feature flow when client or QA engineer are able to test a state of a project before it moves to a production server.
Показаны сообщения с ярлыком viktorfitness. Показать все сообщения
Показаны сообщения с ярлыком viktorfitness. Показать все сообщения
понедельник, 3 июля 2017 г.
воскресенье, 25 июня 2017 г.
Viktor Fitness Project Release v0.0.3
Hello. It is Viktor with the project Viktor Fitness. I am still looking for a job. Do not hesitate if you can and want to help me. Follow on me by social services. The current release number is v0.0.3. I will report the done staff.
New features, changes.
- Data filtering by date period functionality was added..
- Typescript-Sequelize library was integrated. Database is declared by declarative style using decorators.
- e2e protractor tests were integrated. Almost all functionality have been covered by tests.
- Restoring process that loaded data from CSV was deleted.
- Restore/Dump user CLI commands were fixed.
- Viktor's initial data was added.
- Cli command - sync-force-schemas was created.
Подписаться на:
Сообщения (Atom)